China High Quality Cup Injection Molding Suppliers – UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Control the standard by the details, show the toughness by quality". Our firm has strived to establish a highly efficient and stable workers workforce and explored an effective high-quality management system for Injection Molding Small Parts, Electric Molding, Plastic Wall Molding, We are sincerely on the lookout ahead to cooperate with buyers everywhere in the entire world. We imagine we will satisfy along with you. We also warmly welcome consumers to visit our manufacturing unit and purchase our items.
China High Quality Cup Injection Molding Suppliers – UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould Detail:

v:* {behavior:url(#default#VML);}
o:* {behavior:url(#default#VML);}
x:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}

Model NO. JZ-P-C-03-021-A Warranty 12 Months
Metal Color Black Metal Customized Customized
Condition New Size 100mm
Transport Package Wooden Case Specification IS09001: 2000
Trademark JZ Origin China
HS Code 8480719090 Production Capacity 100 Sets/Month

Product Description

PVC Injection Collapsible Core Fitting Mould

High quality with reasonable price and short delivery time

Name PVC Injection Collapsible Core Fitting Mould
Plastic material PVC
Steel of Cavity & Core DIN 1.2316
Steel of Mouldbase S50C. LkM standard^ etc
Nos of Cavity Customized
Hardness of Cavity & Core 42-45HRC
Hardness of Wear Parts 42-48HRC
Core pulling system Motor /oil cylinder/ stripping plate, angel pin^ etc
Mould Accessories DME/HASCO Standard A
Cooling system In core baffle cooling and in cavity plate chain dilling type cooling
Surface fnish Diamond polish
Molding life 1,000, 000shots
Runner Cold
Delivery time 75 work days
Packing wooden case
Payment T/T L/C

Serve

1.   R& D We support customer R& D.
2.   Quotation  Making Mould Quotation will be finished in one day based on information given.
3.   Negotiation The quality, price, material, delivery time, payment ect.
4.   Mould  Design   3-5 days for mould and product 3D drawing design
5.   Mould Make moulds based on customers’ requirements. Mould design sent to  customer for approval first.
Mould will be usually finished in 60 days
6.   Mould  Testing When moulds are finished,  we will test the mould to check whether it  meets customers’ needs.
And we will send samples for reference.
7.   Sample  If the first sample comes out do not satisfy customers, we will modify the  mould until meeting
customers’ satisfaction.
8.   Delivery   Deliver by sea or by train for PPR pipe mould, according to customers’ requirement.


Product detail pictures:

China High Quality Cup Injection Molding Suppliers –  UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould detail pictures

China High Quality Cup Injection Molding Suppliers –  UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould detail pictures


Related Product Guide:
Cooperation

"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our firm to the long-term to develop together with consumers for mutual reciprocity and mutual advantage for China High Quality Cup Injection Molding Suppliers – UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould , The product will supply to all over the world, such as: Bahrain, Cologne, Egypt, As a way to make use of the resource on the expanding information and facts in international trade, we welcome prospects from everywhere on the web and offline. In spite in the top quality products and solutions we supply, effective and satisfying consultation service is supplied by our professional after-sale service group. Solution lists and thorough parameters and any other info weil be sent for you timely for the inquiries. So make sure you get in touch with us by sending us emails or contact us if you have any concerns about our firm. ou can also get our address info from our web site and come to our enterprise. or a field survey of our solutions. We're confident that we have been going to share mutual results and build solid co-operation relations with our companions in this market. We're looking forward to your inquiries.
  • This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Dee Lopez from Indonesia - 2017.03.28 12:22
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Nicola from Austria - 2017.07.07 13:00
    Write your message here and send it to us