OEM Cheap Pier Cap Moulds Factory – UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We can easily normally satisfy our respected buyers with our excellent high-quality, excellent selling price and good service due to we've been far more expert and more hard-working and do it in cost-effective way for Precision Molding, Pvc Paver Block Mould, Mold Tool, Special emphasis around the packaging of merchandise to avoid any damage during transportation,Detailed interest into the useful feedback and strategies of our esteemed shoppers.
OEM Cheap Pier Cap Moulds Factory – UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould Detail:

v:* {behavior:url(#default#VML);}
o:* {behavior:url(#default#VML);}
x:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}

Model NO. JZ-P-C-03-021-A Warranty 12 Months
Metal Color Black Metal Customized Customized
Condition New Size 100mm
Transport Package Wooden Case Specification IS09001: 2000
Trademark JZ Origin China
HS Code 8480719090 Production Capacity 100 Sets/Month

Product Description

PVC Injection Collapsible Core Fitting Mould

High quality with reasonable price and short delivery time

Name PVC Injection Collapsible Core Fitting Mould
Plastic material PVC
Steel of Cavity & Core DIN 1.2316
Steel of Mouldbase S50C. LkM standard^ etc
Nos of Cavity Customized
Hardness of Cavity & Core 42-45HRC
Hardness of Wear Parts 42-48HRC
Core pulling system Motor /oil cylinder/ stripping plate, angel pin^ etc
Mould Accessories DME/HASCO Standard A
Cooling system In core baffle cooling and in cavity plate chain dilling type cooling
Surface fnish Diamond polish
Molding life 1,000, 000shots
Runner Cold
Delivery time 75 work days
Packing wooden case
Payment T/T L/C

Serve

1.   R& D We support customer R& D.
2.   Quotation  Making Mould Quotation will be finished in one day based on information given.
3.   Negotiation The quality, price, material, delivery time, payment ect.
4.   Mould  Design   3-5 days for mould and product 3D drawing design
5.   Mould Make moulds based on customers’ requirements. Mould design sent to  customer for approval first.
Mould will be usually finished in 60 days
6.   Mould  Testing When moulds are finished,  we will test the mould to check whether it  meets customers’ needs.
And we will send samples for reference.
7.   Sample  If the first sample comes out do not satisfy customers, we will modify the  mould until meeting
customers’ satisfaction.
8.   Delivery   Deliver by sea or by train for PPR pipe mould, according to customers’ requirement.


Product detail pictures:

OEM Cheap Pier Cap Moulds Factory –  UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould detail pictures

OEM Cheap Pier Cap Moulds Factory –  UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould detail pictures


Related Product Guide:
Cooperation

With state-of-the-art technologies and facilities, strict good quality regulate, reasonable cost, exceptional assistance and close co-operation with prospects, we're devoted to supplying the top benefit for our customers for OEM Cheap Pier Cap Moulds Factory – UPVC fitting mould Steel of Cavity & Core DIN 1.2316 – Yaxi Mould , The product will supply to all over the world, such as: Argentina, Namibia, Juventus, Our company follows laws and international practice. We promise to be responsible for friends, customers and all partners. We would like to establish a long-term relationship and friendship with every customer from all over the world on the basis of mutual benefits. We warmly welcome all old and new customers to visit our company to negotiate business.
  • In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Lisa from Mumbai - 2018.09.19 18:37
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Odelia from Lithuania - 2017.08.15 12:36
    Write your message here and send it to us